East Coast Hydrogen FEED Design & PEC Work Packages
- Northern Gas Networks
- Yorkshire and the Humber
- Selective procedure
- 19 June 2026 to 19 June 2027
Consultancy services for the East Coast Hydrogen project, covering front-end engineering design (FEED) and planning, environmental, and consents (PEC) work packages. The scope includes developing technical requirements, preliminary designs, cost estimates, and project management processes for DCO and TCPA applications. Work involves defining project scope and risk management for hydrogen network expansion, with specific deliverables tailored to asset-specific and route-corridor requirements.
- Awarded value
- £3.9m
- As published
- Published
- 1 December 2025
- Contract length
- 12 months
- Ends 19 June 2027