Rail Replacement System
- Network Rail High Speed Ltd
- London
- Direct award
- 8 April 2026 to 7 April 2028
Supply of four rail replacement gantries for the HS1 route, capable of operating in single-bore tunnels and performing S&C and CWR exchanges in a single shift. The equipment must interface with 1435mm gauge track, UIC60 rail, and 25kV AC electrification. The scope includes delivery to the Singlewell Infrastructure Maintenance Depot and the provision of comprehensive operator and maintenance training for site personnel.
- Awarded value
- Not published
- Published
- 13 January 2026
- Contract length
- 24 months
- Ends 7 April 2028