Wicksteed Supply and Installation of Play Equipment at Highgate Wood.
- City of London Corporation
- London
- Direct award
- 1 March 2026 to 31 March 2026
Dismantling and removal of existing outdoor gym equipment followed by the supply and installation of new replacement equipment and safety flooring at Highgate Wood playing field. This is a site-specific replacement project involving the removal of legacy infrastructure and the installation of modern fitness equipment and compliant safety surfaces.
- Awarded value
- £36k
- As published
- Published
- 26 January 2026
- Contract length
- 1 month
- Ends 31 March 2026