CR2/CR3 Cupola Wiper Motor Assembly Transparency notice (UK5)
- Defence Equipment and Support
- Direct award
- 22 September 2026 to 30 September 2029
Supply of 200 wiper motor assemblies, split equally between left and right sides, for Challenger 2 and Challenger 3 Main Battle Tanks. Units must be manufactured to specific technical drawing requirements and delivered to the Donnington Fulfillment Centre.
- Awarded value
- £2.4m
- As published
- Published
- 20 February 2026
- Find a Tender
- Contract length
- 36 months
- Ends 30 September 2029