UKRI-5863 Trial Floor Section – Supply & Install
- UK Research and Innovation (UKRI)
- South West
- Direct award
- 16 March 2026 to 30 November 2026
Supply and installation of a trial floor section at Boulby Mine, comprising structural steel flooring, support piles and pile caps, primary and secondary beams, deck plates, structural door bulkheads, cladding, and associated door assemblies. This is a specific construction and structural engineering project within a laboratory environment.
- Awarded value
- £276k
- As published
- Published
- 26 February 2026
- Find a Tender
- Contract length
- 9 months
- Ends 30 November 2026