Manufacture, Supply & Installation of Pipework System
- National Nuclear Laboratory
- North West
- Direct award
- 27 February 2026 to 26 August 2026
The project involves the design for manufacture, off-site fabrication, delivery, and on-site installation of a cooling and flammable pipework system within the A709 building. The scope includes full testing and commissioning of the installed systems to meet site-specific safety and operational requirements.
- Awarded value
- £204k
- As published
- Published
- 3 March 2026
- Contract length
- 6 months
- Ends 26 August 2026