Engineering Vehicles (EV) - Heavy Overhaul of London Underground Switch Tilter (LUST) Wagons
- Transport for London
- London
- Selective procedure
- 4 September 2026 to 3 September 2027
Comprehensive heavy overhaul of 8 London Underground Switch Tilter (LUST) wagons, 6 lifting beams, and 64 pairs of cross and connecting beams. The scope includes mechanical, structural, hydraulic, pneumatic, and electrical system refurbishment, alongside LOLER inspections, non-destructive testing, structural repairs, and repainting. Work must comply with the LUST Maintenance Manual, requiring full overhaul records, assurance certification, and traceability documentation for all safety-critical components.
- Awarded value
- £1.8m
- As published
- Published
- 17 March 2026
- Contract length
- 12 months
- Ends 3 September 2027