Traction Power & Earthing Upgrades - Phase 1 Works
- Transport for Greater Manchester
- North West
This contract covers the assessment and remedial electrical bonding of line-side assets located within the Overhead Contact Line Zone (OCLZ) of the 1CC light rail system. The scope includes conducting condition surveys, producing outline designs, and performing on-site rectification of identified non-compliances to ensure adherence to the Metrolink Infrastructure Technical Specification System Earthing Policy.
- Awarded value
- £527k
- As published
- Published
- 26 August 2025
- Contract length
- Not stated