Shipyard Detailed Design and Build Contract Vehicle and Passenger Carrying Ferries
- Caledonian Maritime Assets Ltd
- Scotland
- Selective procedure
- 28 March 2025 to 7 March 2029
Detailed design and construction of seven replacement vehicle and passenger ferries. The scope includes developing technical drawings and calculations, vessel construction, sea trials, and commissioning in compliance with classification society and UK flag state authority requirements. The project involves ongoing oversight by an on-site client project team throughout the build process.
- Awarded value
- £148m
- As published
- Published
- 16 July 2024
- Contract length
- 47 months
- Ends 7 March 2029