Proposed Peatland Restoration, Caladh, Tighnabruich, Argyll
- Argyll and the Isles Coast and Countryside Trust (ACT)
- Scotland
- Open procedure
- 1 September 2025 to 28 February 2027
Restoration of approximately 229 hectares of blanket bog habitat across two distinct phases. Phase 1 covers 138.8 hectares on the upper site section, and Phase 2 covers 90.2 hectares on the lower section. Work is scheduled to be performed during the winter seasons of 2025/26 and 2026/27, involving site-specific ecological interventions at elevations between 240m and 450m.
- Awarded value
- £519k
- As published
- Published
- 21 March 2025
- Contract length
- 18 months
- Ends 28 February 2027