Contract awardedPlasterboard recycling

Segregated/Unsegregated Waste for Processing & Diversion from General Waste

The contract covers the uplift and processing of approximately 12,500 tonnes of waste per annum across four lots: soil and rubble (3,500t), timber (3,300t), tyres (100t), and excavated carriageway materials (5,600t). Services are required from various council depots throughout the authority and the Ayrshire Roads Alliance area to ensure diversion from general waste streams.

Awarded value
£575k
As published
Published
14 May 2025
Contract length
36 months
Ends 19 August 2028

What the contract covers

Waste processing and diversion service

Provision of waste collection, processing, and diversion services for soil, rubble, timber, tyres, and excavated highway materials from council depots.

  • Uplift previously collected Soil & Rubble waste from Council depots, process it and divert it from general waste, approximately 3,500 tonnes per annum.
  • Uplift previously collected Timber waste from Council depots, process it and divert it from general waste, approximately 3,300 tonnes per annum.
  • Uplift previously collected tyres from Council depots, process them and divert them from general waste, approximately 100 tonnes per annum.
  • Uplift previously collected unsegregated carriageway and footway excavated materials and products from Council depots, process them and divert them from general waste, approximately 5,600 tonnes per annum.
LotEstimated valueSMEs
Lot 1 - Soil & RubbleNot statedNot stated
Lot 1 - Soil & RubbleNot statedNot stated
Lot 2 - TimberNot statedNot stated
Lot 2 - TimberNot statedNot stated
Lot 3 - TyresNot statedNot stated
Lot 3 - TyresNot statedNot stated
Lot 4 - Carriageway & Footway Excavated Materials & ProductsNot statedNot stated
Lot 4 - Carriageway & Footway Excavated Materials & ProductsNot statedNot stated

Terms and requirements

Contract type
Waste processing and diversion service
Procedure
Open procedure
Initial term
36 months
Extensions
12 months + 12 months
Longest it can run
60 months
Contract dates
20 August 2025 to 19 August 2028
Certifications asked for
None stated
Lots
8
Suitable for SMEs
Not stated
Category
Services
CPV codes
90500000, 90513000, 03416000, 19630000

Services in this contract

  • Inert, construction and plasterboard waste recyclingMain service£169k typicalUplift and processing of soil, rubble and excavated carriageway and footway materials
  • Waste treatment and disposal (stream not specified)Uplift and processing of waste tyres from depots (lot 3)
  • Wood waste recycling£325k typicalUplift and processing of timber waste from depots (lot 2)

Lifecycle

  1. Published
  2. Contract awardedto Hamilton Tarmac, Lowmac Alloys and Dow Group Limited
  3. Contract starts
  4. Contract ends
The buyer

East Ayrshire Council

Type
Locked
Contracts, 24 months
Locked
Recorded value
Locked
Typical contract
Locked
Plasterboard recycling contracts, 24 months
Locked
Buys mostLocked
Contact details
Name
Locked
Email
Locked
Phone
Locked
Website
Locked
Address
Locked
See everything East Ayrshire Council buys
The suppliers

Hamilton Tarmac

Contracts won, 24 months
Locked

Lowmac Alloys

Contracts won, 24 months
Locked
Value won, 24 months
Locked

Dow Group Limited

Contracts won, 24 months
Locked
See everything they have won

Similar plasterboard recycling contracts and prices

4 plasterboard recycling contracts were awarded in Scotland in the last 24 months. See who won them and what they went for, next to this one.

See who won them →

Cite this contract

Link
https://bidskim.com/tender/359972/segregated-unsegregated-waste-for-processing-and-diversion-from-general-waste
Buyer reference
org-12
Open contracting ID
ocds-r6ebe6-0000796223
Last checked
5 November 2026

East Ayrshire Council. Segregated/Unsegregated Waste for Processing & Diversion from General Waste. Contract award, 14 May 2025. BidSkim, https://bidskim.com/tender/359972/segregated-unsegregated-waste-for-processing-and-diversion-from-general-waste (accessed 5 November 2026).