Invercauld Estate Peatland Restoration Project Monaltrie Moss South 2025
- Cairngorms National Park Authority
- Scotland
- Open procedure
- 1 August 2025 to 28 January 2026
Restoration of 110 hectares of eroded peatland using four low ground pressure machines and manual labour. The project requires complex logistics, including helicopter transport for 150 tonnes of stone, coir mesh, logs, and timber dam materials. Work must be scheduled to avoid protected breeding bird constraints, with all materials formed into dams, baffles, and spillways on-site.
- Awarded value
- £431k
- As published
- Published
- 12 June 2025
- Contract length
- 6 months
- Ends 28 January 2026