North West Relief Road Project
- Shropshire Council
- West Midlands
- 10 January 2025 to 24 September 2027
Construction of a 6.9 kilometre single carriageway road including a new bridge over the River Severn and its flood plain, plus a bridge over the Shrewsbury-Chester railway line. The project includes an adjacent combined footway and cycleway, connecting the A5 at Welshpool Road roundabout to the Ellesmere Road roundabout.
- Awarded value
- Not published
- Published
- 4 March 2024
- Awarded
- 30 April 2026
- Contract length
- 32 months
- Ends 24 September 2027