CCoE Learning Space 2 at New College Durham is refitted by Meldrum Group
- New College Durham
- North East
- Call-off, 3 bids
- 2 February 2026 to 21 August 2026
New College Durham hired Meldrum Group to turn an industrial warehouse into CCoE Learning Space 2, for students on a range of trades courses. CCoE is the college's Construction Centre of Excellence.
The building follows Shed 1, the first learning space, which was redeveloped in 2022 and 2023. The plan was for open workshops, teaching rooms and a new mezzanine with space for tiling, low-level joinery, spray booths and a maintenance area.
The college ordered the work through NEPO's Framework Contract for Construction Works (NEPO207). Meldrum Group, a small business, won on lowest price from three bids. The £1,628,099 contract ran from February 2026 and was due to end in August 2026.
- What
- Building refurbishment, remodelling and conversion
- Buyer
- New College Durham
- Supplier
- Meldrum Group
- Value
- £1.63m
- How it was bought
- Call-off, NEPO (The Association of North East Councils Limited)
- 3 bids
- Dates and next
- Feb 2026 to Aug 2026