DLR Thamesmead Extension - Gas Diversion Feasibility Design and Options Study
- Transport for London
- London
- Direct award
- 14 August 2026 to 24 February 2027
This contract covers a C3 stage feasibility design and options study for gas main diversions and AGI rationalisation required for the DLR Thamesmead Extension. The scope includes desktop-based assessment of high, intermediate, and medium-pressure gas mains, engagement of a Cadent-approved design house, material take-off assessments, high-level cost estimation, and the mobilisation of a multi-disciplinary project management team to coordinate technical interfaces and stakeholder engagement.
- Awarded value
- £1.6m
- As published
- Published
- 9 June 2026
- Contract length
- 6 months
- Ends 24 February 2027