Viability Study and Options Appraisal for historic Boilerhouse
- National Mining Museum Scotland
- Scotland
- Open procedure
- 27 October 2025 to 25 January 2026
Development of a RIBA Stage 2 viability study for a derelict 1915 boiler house. The work involves reviewing existing structural and conservation reports, engaging with the client to refine design options, producing visualisations and base drawings, and compiling outline costs for restoration and visitor access.
- Awarded value
- £10k
- As published
- Published
- 9 October 2025
- Contract length
- 3 months
- Ends 25 January 2026