Telecoms Installation
- Offshore Renewable Energy Catapult
- Scotland
- Direct award
- 29 June 2026 to 30 September 2026
The project involves slewing and lowering existing 1-4 way ducting using a two-trench method in the footway, including lateral and vertical adjustments. The service requires the deployment of fully equipped two-man civils and cabling teams operating Monday to Saturday, 06:00 to 18:00, with a minimum 10-hour shift requirement. The scope also includes site establishment, de-establishment, production of RAMS, and conducting statutory undertaker searches.
- Awarded value
- £66k
- As published
- Published
- 26 June 2026
- Contract length
- 3 months
- Ends 30 September 2026