Flatflex Waste Composition Analysis
- ReLondon (London Waste and Recycling Board)
- London
- Open procedure
- 1 September 2026 to 31 May 2027
Conduct a two-phase waste composition analysis across 15 pilot sites in three London boroughs, covering 500-700 properties per phase. The work involves sorting residual, dry recycling, and flexible plastic waste streams into specific material categories to assess the impact of collection interventions. Bidders must provide risk assessments, manage waste sorting, and potentially arrange waste collection from communal bin areas. The project requires pre-pilot monitoring in September 2026 and post-pilot monitoring in early 2027.
- Awarded value
- £62k
- As published
- Published
- 30 June 2026
- Contract length
- 9 months
- Ends 31 May 2027