Refurbishment of Valves at Raith Reservoir
- South Ayrshire Council
- Scotland
- Invited to quote
Refurbishment of existing valve infrastructure at Raith Reservoir. This is a technical mechanical engineering project involving the overhaul of specific water control assets to ensure operational integrity and safety. The work is site-specific and requires specialist mechanical installation expertise to restore functionality to existing reservoir valve systems.
- Awarded value
- £106k
- As published
- Published
- 20 March 2026
- Contract length
- Not stated