Gym floor replacement at Corby East Midlands International Pool
- North Northamptonshire Council
- East Midlands
- Open procedure
- 21 September 2026 to 31 March 2027
Uplift and replacement of existing timber flooring with LVT around 21 floor boxes, replacement of 10mm everoll rubber flooring, installation of 38x48mm Oak Combi Skirting, and installation of 43mm Regupol rubber weights tiles with Berlin Grey Fleck surface.
- Awarded value
- £49k
- As published
- Published
- 3 August 2026
- Contract length
- 6 months
- Ends 31 March 2027