Future Offshore Wind (FOSW) Metocean Survey Capability- Preliminary Market Engagement
- The Crown Estate
- 1 March 2027 to 1 September 2028
A 12-month offshore metocean survey campaign commencing mid-2027 across multiple offshore locations. Involves data acquisition through measurement systems and instrumentation, including the collection and analysis of wind, wave, and current data, alongside technical advisory and survey management services.
Closed· 25 September 2026
- Estimated value
- Not published
- No value in the notice
- Published
- 19 September 2026
- Deadline
- 25 September 2026
- Closed
- Contract length
- 18 months
- Ends 1 September 2028