Consultancy support to develop and coordinate electrical infrastructure upgrades at Marsh Lane Depot
- New Forest District Council
- South East
- 1 September 2026 to 1 September 2028
Develop electrical and civil engineering designs through RIBA Stages 2, 3 and 4 for depot-wide infrastructure upgrades. Work includes assessing existing capacity constraints, coordinating a secondary substation connection with SSEN, designing Phase 1 EV charging infrastructure, safeguarding for future phases, cost planning and option appraisal, and preparing technical information for construction procurement.
- Awarded value
- Not published
- Published
- 1 September 2026
- Contract length
- 24 months