NEPO209 Highways Infrastructure Survey - Lots 3, 6 & 8
- North Tyneside Council
- North East
- 3 August 2026 to 3 August 2027
Three highway infrastructure survey lots covering SCRIM surveys and GripTester testing, visual condition surveys, and delivery to the DfT Data Standard. No road lengths, survey frequencies or technical thresholds are specified.
- Awarded value
- £85k
- As published
- Published
- 3 August 2026
- Contract length
- 12 months
- Ends 3 August 2027