Vantive Water Treatment Plant – Installation, Commissioning
- Imperial College Healthcare NHS Trust
- London
- Direct award
- 1 December 2026 to 31 December 2026
Installation and handover of supporting equipment and infrastructure for a Vantive CWP800 reverse-osmosis water treatment system at one hospital site, including associated components, testing and documentation for safe operation of a haemodialysis water treatment system.
- Awarded value
- £289k
- As published
- Published
- 19 October 2026
- Contract length
- 1 month
- Ends 31 December 2026