Replace Oil Boilers - Cowick Church of England Voluntary Controlled primary School, Snaith Road
- East Riding of Yorkshire Council
- Yorkshire and the Humber
- Invited to quote
- 10 August 2026 to 7 September 2026
Replacement of two existing oil-fired boilers with high-efficiency condensing kerosene units, new flues, ECM pumps and controls, modified oil and boiler-house pipework, and selected low-surface-temperature classroom radiators. Includes asbestos management, electrical works, flushing, water treatment, balancing, commissioning and handover.
- Awarded value
- £38k
- As published
- Published
- 19 October 2026
- Contract length
- 1 month
- Ends 7 September 2026