FALCON valve prototype for UK Fusion Energy's STEP Prototype Powerplant
- UK Fusion Energy Ltd
- Open procedure
- 5 April 2027 to 5 April 2028
UK Fusion Energy Ltd wants a firm to design in detail and build a scaled-down prototype of the Fast Acting Low Conductance valve (FALCON). The valve would protect the exhaust vacuum pumping planned for the STEP Prototype Powerplant (SPP) during disruption mitigation or a sudden, massive inrush of air. It must reach its closed position within 37.5 ms.
The work covers the valve casing and everything inside it, chiefly the actuation mechanism and the seals. The seals must keep the valve working and the process gas line under vacuum. Technical quality counts for 60% of the score, price for 30% and social value for 10%. It is suitable for small businesses.
The work is estimated at £200,000. The deadline for bids is 4 December 2026, and the contract runs for a year from April 2027.
Closes in 12 days· 4 Dec 2026
- What
- Nuclear technical support, engineering and safety
- Buyer
- UK Fusion Energy Ltd
- Estimated value
- £200,000
- How it is being bought
- Open procedure
- Bids due
- 4 Dec 2026
- Contract dates
- Apr 2027 to Apr 2028