RIDC Melton - Maintenance of Infrastructure
- Network Rail Infrastructure Limited
- East Midlands
- 13 December 2024 to 14 October 2026
Maintenance of the RIDC Melton test track facility, covering vegetation management, fencing, structures, track, power distribution, DC and 25kv OLE electrification, signalling, and drainage. The scope includes reactive works under £200,000, support for new test environments such as hydrogen train infrastructure and ETCS Level 2 systems, and a 2-mile OHL infrastructure extension.
- Awarded value
- £16.7m
- As published
- Published
- 2 November 2021
- Find a Tender
- Contract length
- 22 months
- Ends 14 October 2026