T0645 KPIs Reporting and Technical Support including Ride Quality
- National Highways
- Selective procedure
- 26 March 2025 to 30 June 2027
The contract involves monthly calculation and reporting of pavement condition and ride quality performance indicators, including drafting commentary for executive dashboards. It also requires technical support to transition from manual quality assurance methods, such as volumetric patch testing, to vehicle-based laser assessment technologies for asphalt surface monitoring across the strategic road network.
- Awarded value
- £450k
- As published
- Published
- 31 March 2025
- Contract length
- 27 months
- Ends 30 June 2027