Design, Supply and Install of a Materials Recovery Facility (MRF)
- Glasgow City Council
- Scotland
- 2 April 2025 to 3 April 2027
Design and installation of a modular, automated Materials Recovery Facility (MRF) capable of processing 30,000 tonnes per annum of fibre, 20,000 tonnes of containers, and 30,000 tonnes of commingled waste. The facility must support a new recycling collection model with low picker numbers and low lifecycle costs, meeting a minimum 10-year operational lifespan. The project is part of a multi-use site redevelopment including an HWRC and transfer station.
- Awarded value
- £15.2m
- As published
- Published
- 18 October 2023
- Find a Tender
- Contract length
- 24 months
- Ends 3 April 2027