Coppermills WS-SRP Procurement
- Thames Water
- South East
- 10 March 2025 to 9 November 2035
Design and construction of a 700 Ml/d High Lift Pumping Station and a 260 Ml/d Slow Sand Filter recirculation system. Includes complex site-wide electrical upgrades, SCADA integration, and structural modifications to existing contact tanks and filters. The project involves significant civil, mechanical, and MEICA works within a busy operational water treatment facility, requiring asset protection and decommissioning of redundant infrastructure.
- Awarded value
- Not published
- Published
- 19 January 2024
- Contract length
- 128 months
- Ends 9 November 2035