Design and build project for the overcladding of a 1971 reinforced concrete building using a demountable cassette-type aluminium rainscreen system. Works include structural survey, testing, and remediation of existing panels, installation of firebreaks, and replacement of all windows with high-performance units to improve thermal efficiency and reduce heat loss. The project requires a 25-year insurance-backed warranty and involves a 6-week design phase followed by a 32-week construction programme.
- Awarded value
- £4.1m
- As published
- Published
- 7 May 2024
- Find a Tender
- Contract length
- 24 months