GWR - Decarbonisation Additive
- First Greater Western Limited
- South West
- 16 May 2025 to 16 May 2028
Installation of holding tanks, dispenser pumps, and monitoring software at five engineering depots to support the integration of decarbonisation additives into diesel train refuelling systems. The contract includes the ongoing supply of additive products across the network, requiring technical integration with existing depot infrastructure.
- Awarded value
- Not published
- Published
- 25 September 2024
- Awarded
- 16 May 2025
- Contract length
- 36 months
- Ends 16 May 2028