De-silt and Repairs to Elm Pond, Wallington - London Borough of Sutton
- London Borough of Sutton
- London
- Open procedure
- 24 June 2025 to 31 December 2025
De-silting and structural repair works for Elm Pond, including a minimum allocation of £5,000 specifically for identified repair tasks. The project requires site-specific access management via London Road and completion of all works within the specified timeframe.
- Awarded value
- £30k
- As published
- Published
- 9 April 2025
- Contract length
- 6 months
- Ends 31 December 2025