STA-25019 Refurbishment of Bourne Lecture Theatre Seating
- Royal Holloway, University of London
- South East
- Direct award
- 26 June 2025 to 12 September 2025
Refurbishment of the existing seating arrangement within the Bourne Lecture Theatre. The project involves the removal, repair, or replacement of theatre-style seating units to restore functionality and aesthetic standards for university teaching spaces.
- Awarded value
- £74k
- As published
- Published
- 30 July 2025
- Contract length
- 3 months
- Ends 12 September 2025