Splash Pad Project at Clifton Park
- Rotherham Metropolitan Borough Council
- Yorkshire and the Humber
- Direct award
- 10 February 2025 to 10 August 2025
Detailed design and construction of a splash pad facility, including civil works, masonry, surfacing, and fencing. The project requires the installation of a new plant room with a recirculating or flow-through water treatment system compliant with PWTAG guidelines, alongside the integration of water jets and interactive features.
- Awarded value
- £728k
- As published
- Published
- 10 February 2025
- Contract length
- 6 months
- Ends 10 August 2025