Welfare refurbishment M&E engineering for City of London goes to Seneca
- City of London Corporation
- London
- Below threshold - limited competition
- 1 May 2026 to 30 September 2029
City of London Corporation appointed Seneca Group Limited as mechanical and electrical engineer for the COL Welfare Facilities Refurbishment. Seneca provides professional services to the project, covering the building services engineering design.
The corporation picked the firm after a limited competition. The £42,840 contract runs for 41 months, from May 2026 to September 2029.
Contract ends September 2029
- What
- Building services (M&E) engineering design
- Supplier
- Seneca Group Limited
- Value
- £42,840
- How it was bought
- Below threshold - limited competition
- Dates and next
- May 2026 to Sep 2029