Glen Rosa LNG commissioning for Ferguson Marine goes to Waves Group
- Ferguson Marine (Port Glasgow) Ltd
- Scotland
- Open procedure, 1 bid
Ferguson Marine (Port Glasgow) Ltd hired Waves Group, a small business, to support the commissioning of the LNG fuel system on Glen Rosa.
The team sees the ship through its first LNG bunkering and the cooldown of its LNG tank. The team's work includes checking the emergency shutdown, boil-off gas and vaporiser systems and the bunkering lines, then keeping watch for 24 hours after bunkering as the MCA requires. The crew also supports Ferguson Marine through handover until the vessel is signed off and delivered.
Staff must be marine engineers holding IGF Code certificates, with roles running from chief engineer to officer of the watch. Technical quality made up 70% of the score and price 30%. Waves Group was the only bidder in an open tender and was awarded £600,000 in June 2026.
- What
- Marine engineering and naval architecture
- 2 of 2 lots awarded
- Supplier
- Waves Group
- Value
- £600,000
- Across 2 lots
- How it was bought
- Open procedure
- 1 bid
- Dates and next
- 15 Jun 2026