Offshore wind mooring study for ORE Catapult goes to Intermoor
- Offshore Renewable Energy Catapult
- Scotland
- Direct
- 29 April 2026 to 1 August 2026
Offshore Renewable Energy Catapult hired Intermoor Limited to look at possible anchorages for temporary offshore wind moorings in the Cromarty Firth and Scapa Flow.
Intermoor was to present a selection of case studies built on the technical facts it gathered. Those facts ranged from the expected throughput to which components would be wet-stored and the preferred mooring set-up.
The catapult awarded the £47,976 contract directly in April 2026. The work was due to end in August 2026.
- What
- Marine engineering and naval architecture
- Supplier
- Intermoor Limited
- Value
- £47,976
- How it was bought
- Direct
- Dates and next
- Apr 2026 to Aug 2026