Forestry England is paying High Voltage Systems and Services Limited to give Alice Holt Research Station a new high-voltage electricity supply. The station will be linked to the distribution network run by Scottish and Southern Electricity, the local network operator.
The supplier is installing a substation, along with 11kV and low-voltage cabling and service position works. Non-contestable works are included too.
Forestry England awarded the £267,608 contract directly in October 2026. It is due to end in October 2027.
Contract ends October 2027
- What
- Electricity network works and connections
- Buyer
- Forestry England
- Value
- £267,608
- How it was bought
- Direct award
- Dates and next
- Oct 2026 to Oct 2027