Hamilton Architects leads Hackney Service Centre cooling feasibility study
- London Borough of Hackney
- London
- Direct award
- 25 September 2026 to 26 November 2026
Hamilton Architects LLP is leading a feasibility study for the London Borough of Hackney on replacing the cooling at Hackney Service Centre. The centre, at 1 Hillman Street, has a secondary cooling system that has reached the end of its life on all five floors.
The architect works with a specialist mechanical and electrical engineer and a quantity surveyor. Hackney awarded the £193,000 study directly in August 2026, through lot 1 of the AMD Professional Consultancy Services Framework. It is due to end in November 2026.
Contract ends November 2026
- What
- Multidisciplinary design team
- Supplier
- Hamilton Architects LLP
- Value
- £193,000
- How it was bought
- Direct award
- Dates and next
- Sep 2026 to Nov 2026