Ventro will design and install solar PV at Locks Heath Keystone
- Hampshire County Council
- South East
- Call-off
- 16 November 2026 to 20 November 2026
Hampshire County Council is having a new solar PV system fitted at Locks Heath Keystone, with Ventro designing and installing it.
Ventro will work with a subcontractor on the design and fitting, and will connect the system into the building.
The council ordered the £15,000 job through its Minor Works Framework 2026-2030 in September 2026. The work is due to take place in November 2026.
- What
- Solar PV and battery storage
- Supplier
- Ventro
- Value
- £15,000
- How it was bought
- Call-off, Minor Works Framework 2026-2030
- Dates and next
- Nov 2026 to Nov 2026