Middletonmurray repairs the cornices at Haringey's George Meehan House
- London Borough of Haringey
- London
- Limited
- 13 April 2026 to 1 June 2026
The London Borough of Haringey hired Middletonmurray Infrastructure Services to repair damaged decorative cornices and other parts of the façade at George Meehan House.
Defective concrete had to come out before the cornices were rebuilt with Sika MonoTop repair systems and protective coatings. Each repair had to match the shape and finish of the original. The building remained occupied throughout, and Middletonmurray had to design and provide its own scaffolding and access.
The borough awarded the £59,312 contract in April 2026, and the work was due to end in June 2026.
- What
- Concrete repair and cathodic protection
- Value
- £59,312
- How it was bought
- Limited
- Dates and next
- Apr 2026 to Jun 2026