Contract awardedConcrete repair and cathodic protection
Structural Renovations makes emergency repairs at Pelham Primary School
- London Borough of Merton
- London
- 9 December 2025 to 31 January 2026
The London Borough of Merton called in Structural Renovations Limited for emergency work on Pelham Primary School's precast concrete window surrounds. The repairs were structural, and the job covered that school alone.
The work was estimated at £14,400 over a two-month term. It began in December 2025 and was due to end in January 2026.
- What
- Concrete repair and cathodic protection
- Supplier
- structural renovations limited
- Value
- £14,400
- How it was bought
- Not published
- Dates and next
- Dec 2025 to Jan 2026