Humber Bridge heat pump replacement goes to Airco Refrigeration
- Humber Bridge Board
- Yorkshire and the Humber
- Below threshold - limited competition
- 9 February 2026 to 30 April 2026
Humber Bridge Board hired Airco Refrigeration and Airconditioning Limited, a small business, to replace four air source heat pumps on the Humber Bridge.
The pumps sit in plantrooms within the bridge deck, and Airco was to supply the new units as well as fit them. The board chose the firm after a limited competition.
The £72,000 contract ran from February 2026 and was due to end in April 2026.
- What
- Heat pumps
- Buyer
- Humber Bridge Board
- Value
- £72,000
- How it was bought
- Below threshold - limited competition
- Dates and next
- Feb 2026 to Apr 2026