Contract awardedFire engineering and fire strategy

Byker Wall fire strategies for Karbon Homes go to Part B Group

Karbon Homes hired Part B Group Ltd, a small business, to review fire safety at three BSR-registered buildings on Byker Wall.

The registered buildings are Byker Wall at Dunn Terrace, Shipley Street and Grace Lee. Low-rise buildings and a pilot scheme at Byker Crescent are covered too. Each registered building gets a gap analysis and a retrospective fire strategy. The work takes in compartmentation plans, site surveys with 3D scanning, and fire engineering checks against past building regulations. Escape routes, passive fire protection and fire safety management are all checked for gaps.

Price alone decided the award, and one bid was received. Karbon Homes awarded the £354,000 contract in February 2026.

What
Fire engineering and fire strategy
Value
£354,000
How it was bought
Not published
1 bid
Dates and next
24 Feb 2026

How it was bought

1 official notice
  1. 24 Feb 2026Award noticeFind a Tender

How it compares

With every fire engineering and fire strategy award since 2021

Half of awards fall between £28,938 and £99,009Median £52,033

Awards
252
Firms that won them
112
Median award
£52,033
of 242 with a value
This award
Bigger than 92%
of them
Typical length
1 year
In North East
8 awards

Part B Group Ltd ranks 4th of 112 firms for fire engineering and fire strategy awards since 2021.

RankFirmAwardsValue
1Locked24£1.09m
2Locked13£1.19m
3Locked10£2.98m
4Part B Group Ltd Won this one9£1.16m
5Locked8£704,735
5Locked8£423,985
See who wins this work

Figures to 21 November 2026

Fire engineering and fire strategy at other buyers

Karbon Homes has awarded 144 contracts since 2021.

See Karbon Homes's page
  • Part B Group Ltd has won 16 public contracts since 2021.

1 fire engineering and fire strategy tender is open now

See it
More fire engineering and fire strategy contracts awarded in 2026