Project Centre designs Essella Road Footbridge works for Kent
- Kent County Council
- South East
- Call-off, 1 bid
Kent County Council hired Project Centre Limited to carry out detailed design for the Essella Road Footbridge in Ashford.
The bridge takes a well-used footpath over the railway between a large secondary school and its catchment of homes. It crosses two tracks of the Ashford to Ramsgate line between Ashford and Wye stations, plus four tracks at a rail maintenance depot run by Hitachi. Its 37.5m deck is a single-span steel through truss resting on masonry abutments. The structure has deteriorated, and the council has been responsible for it since 1953.
Project Centre's work also covers a review of existing data, the site investigations needed and budget estimates for the later construction stages. The council ordered the £115,000 job through the Highways & Highway Structures lot of Medway Council's Civil & Structural Engineering Consultancy Services Framework 2025-29.
- What
- Bridge and structures inspection, assessment and design
- Buyer
- Kent County Council
- Supplier
- Project Centre Limited
- Value
- £115,000
- How it was bought
- Call-off, Medway Council
- 1 bid
- Dates and next
- 20 Jan 2026