Heathrow Infrastructure Project work at two IRCs goes to Wates
- Ministry of Justice
- London
- Call-off
The Ministry of Justice ordered the Heathrow Infrastructure Project from Wates, covering an office fit-out and electrical upgrades at Harmondsworth and Colnbrook immigration removal centres.
At Harmondsworth IRC, Wates was to design and fit out an open-plan office with more desks. The second floor was planned to hold 78 desks, a 14-person boardroom, a prayer room and a refreshment area seating up to 13.
The electrical work aimed to make both centres more resilient and leave room for expansion. At Harmondsworth, that meant a new 1600kVA transformer and a 1250kVA back-up generator, with the site kept running throughout. The call-off came through the MoJ Constructor Services Framework and was estimated at £5.6m.
- What
- HV and LV distribution, switchgear and substations
- Buyer
- Ministry of Justice
- Supplier
- Wates
- Value
- £5.64m
- How it was bought
- Call-off, MoJ Constructor Services Framework
- Dates and next
- 15 May 2026