The Ministry of Justice hired Air Plants Dust Extraction Ltd to replace the local exhaust ventilation (LEV) system in the woodwork workshop at HMP Sudbury. It is a prison industries workshop, and the old system will be taken out and one new system put in.
Bids were scored on technical compliance and performance and support at 30% each, with installation and delivery and warranty at 20% each. Four bids came in. The £250,000 contract was awarded in November 2026 and is due to end in March 2027.