Contract awardedOn-track plant and engineering trains

Colas Rail maintains Network Rail's New Measurement Train (NMT)

Network Rail Infrastructure Limited hired Colas Rail Ltd to maintain the New Measurement Train (NMT), part of its infrastructure monitoring fleet.

The NMT runs over busy, high-mileage routes, gathering the data that shows whether track meets its standards. Its 9 vehicles include Class 43 power cars and Mk3 trailer cars. Colas Rail supplies technicians for overnight exams, fault response and riding on the train, alongside heavy and light maintenance and cleaning. It also supports the QL3 and QL4 MTU engine overhauls run by a separate maintainer.

Three firms bid. Quality scoring took in delivery of service, resources and facilities, as well as lower utility use, circular economy and social stewardship. The award was £8.48m, with two optional 12-month extensions.

What
On-track plant and engineering trains
Value
£8.48m
How it was bought
Not published
3 bids
Dates and next
8 Sep 2025

How it was bought

2 official notices
  1. 13 Feb 2025Tender noticeFind a Tender
  2. 14 Mar 2025Bids closed3 bids
  3. 10 Sep 2025Award noticeFind a Tender

Network Rail Infrastructure Limited has bought this 12 or more times since 2021

Typical length
3.5 years
Typical value
£10.5m
Suppliers used
13
in 12 of its purchases
AwardedContractWon byValue
May 2026Locked5 yearsLocked£1.44m
Apr 2026Locked4 yearsLocked£12.5m
Jan 2026Locked3 yearsLocked£1.69m
Jan 2026LockedLocked£103.6m
Sep 2025This purchase1 yearColas Rail Ltd£8.48m

and at least 7 more

Suppliers Network Rail Infrastructure Limited has used in 12 of its purchases

SupplierContractsValue
Colas Rail Ltd Won this one4·
Locked1£12.5m
Locked1£3.83m
Locked1·
Locked1·

and 8 more

See the contracts and who won them

Figures to 21 November 2026

How it compares

With every on-track plant and engineering trains award since 2021

Half of awards fall between £734,720 and £4.39mMedian £1.5m

Awards
51
Firms that won them
34
Median award
£1.5m
of 39 with a value
This award
Bigger than 79%
of them
Typical length
2 years

Colas Rail Ltd ranks 1st of 34 firms for on-track plant and engineering trains awards since 2021.

RankFirmAwardsValue
1Colas Rail Ltd Won this one5£440.5m
2Locked4£2.97m
3Locked3£13.3m
4Locked2£198.8m
4Locked2£104.8m
4Locked2£3.83m
See who wins this work

On-track plant and engineering trains at other buyers

Network Rail Infrastructure Limited has awarded 274 contracts since 2021.

See Network Rail Infrastructure Limited's page
  • Colas Rail Ltd has won 10 public contracts since 2021, 4 of them from Network Rail Infrastructure Limited.

    • Jan 2026Locked£84.9m
    • Sep 2025This purchase£8.48m
    • Apr 2025Locked£12.7m
    • Jan 2025Locked£317.8m
    See the contracts

1 on-track plant and engineering trains tender is open now

See it
More on-track plant and engineering trains contracts awarded in 2025