Rock cutting and drainage: Network Rail plans a Wales & Western framework
- Network Rail Infrastructure Limited
- 1 March 2027 to 1 March 2030
Network Rail Infrastructure Limited plans a framework for civil engineering and geotechnical work in its Wales and Western region. Most of it is remedial work on rock cuttings, drainage of earthworks and managing burrowing. Suppliers would take schemes from investigation and design through to construction and handback, acting as Principal Contractor and sometimes as Principal Designer.
There are two lots, one for Wales and one for Western, and no firm may win more than one. Bidders would need to be registered on RISQS with the listed category codes and hold a Network Rail Principal Contractor Licence.
The estimate was £77.6m when first published, with lot 1 at £40.8m and lot 2 at £36.8m. A later update put it at £150m. The framework would run for three years with two one-year extensions, to March 2032 at the latest.
- What
- Retaining walls, slope stabilisation and land hazard works
- Estimated value
- £77.6m
- How it will be bought
- Not published
- Responses due
- 14 Sep 2026
- Contract dates
- Mar 2027 to Mar 2030
- Option to Mar 2032